Home-Office Renovation & Roof Deck in Indahag (ORIGINAL COST ESTIMATE)

ORIGINAL COST ESTIMATE

Project Name: The Patio Renovation
Location: Indahag, Cagayan de Oro City
Client: Rex “The Patio”
Total Floor Area: 412 sqm
Prepared By: JMG DESIGN AND BUILD
Date: November 14, 2024


PROJECT OVERVIEW

This proposal outlines the renovation and extension of a 412 sqm property at The Patio in Indahag, Cagayan de Oro City. The scope includes the second-floor office area, third-floor family area, and roof deck. This design prioritizes efficient workflow layouts, modern aesthetics, and lightweight construction, ensuring cost-effectiveness and structural integrity for potential future expansions.


COST BREAKDOWN

1. Phase 1: Planning & Mobilization

Covers pre-construction activities, including permits, initial documentation, and site preparation.

ItemQuantityUnit Cost (PHP)Subtotal (PHP)
Building Permits1 lot300,000300,000
Initial Documentation1 lot200,000200,000
Subtotal500,000

2. Phase 2: Construction

2nd Floor – Office Area
Industrial design for 20 employees with layouts optimizing workflow efficiency.

ItemQuantityUnit Cost (PHP)Subtotal (PHP)
Prefabricated Materials1 lot800,000800,000
Lighting & Fixtures1 lot300,000300,000
Labor Costs1 lot900,000900,000
Subtotal2,000,000

3rd Floor – Family Area
A family space including three bedrooms and glass partitions for an open yet private aesthetic.

ItemQuantityUnit Cost (PHP)Subtotal (PHP)
Glass Dividers1 lot500,000500,000
Lightweight Panels1 lot600,000600,000
Labor Costs1 lot700,000700,000
Subtotal1,800,000

Roof Deck
Guest rooms, a partially covered roof, and an open lounge area for gatherings.

ItemQuantityUnit Cost (PHP)Subtotal (PHP)
Prefab Roofing1 lot300,000300,000
Structural Work1 lot400,000400,000
Lounge Materials1 lot200,000200,000
Labor Costs1 lot100,000100,000
Subtotal1,000,000

3. Phase 3: Finishing & Turnover

Final touches, including cleaning, quality inspections, and project handover.

ItemQuantityUnit Cost (PHP)Subtotal (PHP)
Cleaning & Finishing1 lot150,000150,000
Final Inspections1 lot200,000200,000
Quality Assurance1 lot150,000150,000
Subtotal500,000

TOTAL PROJECT COST

PhaseTotal (PHP)
Planning & Mobilization500,000
Construction4,800,000
Finishing & Turnover500,000
Grand Total5,800,000

TERMS & CONDITIONS

  1. Payment Terms:
    • 30% down payment upon contract signing.
    • Remaining balance to be paid in milestone-based installments.
  2. Timeline:
    • Planning & Mobilization: 2 weeks.
    • Construction: 3 months.
    • Finishing & Turnover: 2 weeks.
  3. Warranty:
    • Includes a 1-year warranty for structural integrity and workmanship.
  4. Exclusions:
    • Luxury finishes or significant structural modifications outside the project scope.
    • Costs incurred due to client-initiated changes or unforeseen circumstances.

NEXT STEPS

  1. Approval: Confirm acceptance of this estimate by signing below.
  2. Kick-Off Meeting: Schedule a session to finalize project details and timelines.

Client Approval:
Signature: ____________________________
Date: _________________________________

Leave a Reply

Your email address will not be published. Required fields are marked *

Scroll to Top