Planning a construction project in Cagayan de Oro City? Whether you’re a homeowner, contractor, or developer, understanding how to secure a demolition and building permit in Cagayan de Oro is essential. This comprehensive guide walks you through the process via the Office of the Building Official (OBO), in compliance with the National Building Code of the Philippines.
π Basic Requirements
- πΉ Completed Demolition Permit Application Form (notarized)
- π Proof of ownership (Transfer Certificate of Title, Tax Declaration, or Tax Clearance)
- π· Photographs of the existing structure
- π Demolition Plan signed and sealed by a licensed Civil Engineer or Architect
- πΊοΈ Vicinity Map, Site Development Plan, or Floor Plan
- πͺͺ Professional’s PRC ID and PTR with three specimen signatures
- π Proof of utility disconnection (if applicable)
- βοΈ Authorization Letter or Special Power of Attorney (if filed by a representative or contractor)
- π’ Board Resolution or Secretaryβs Certificate (if filed by a corporation or developer)
β Responsibilities by Role
- π€ Homeowner: Submits ownership documents, hires a supervising professional, and covers permit fees.
- π οΈ Contractor: Applies with ownerβs authorization, supervises demolition, ensures safety, and coordinates disconnection of utilities.
- ποΈ Developer: Designates an official representative, manages demolition documents, and coordinates compliance with OBO.
π° Fees
- π Approximately β±3.00 per sq.m. (based on floor area)
- π’ Additional charges apply for tall structures, fences, or other appendages
β±οΈ Timeline
- π Notify OBO at least 5 days before starting demolition
- β οΈ Follow all safety protocols, ensure debris disposal, and prepare for OBO inspections

π Documentary Requirements
- π Land ownership documents (TCT, Tax Declaration, Tax Clearance)
- π Unified Application Forms (notarized and completed by the owner and professionals)
- π Signed and sealed plans: Architectural, Structural, Sanitary, Electrical, Mechanical, Electronics
- πΊοΈ Geodetic Lot Plan and Vicinity Map
- π Bill of Materials / Cost Estimates / Structural Design Analysis
- π¦Ί Construction Safety and Health Program (approved by DOLE)
- π₯ Fire Safety Evaluation Clearance (issued by the BFP)
- π Zoning / Locational Clearance (from CPDO)
- ποΈ Barangay Clearance
- βοΈ Authorization or SPA (if filed by a contractor or firm)
β Required Signatories
- π§βπ¨ Architect (for architectural plans)
- ποΈ Civil/Structural Engineer
- π‘ Electrical Engineer
- π½ Sanitary Engineer or Master Plumber
- βοΈ Mechanical Engineer (if applicable)
- π‘ Electronics Engineer (if applicable)
- π Geodetic Engineer
- π§βπΌ Owner or Authorized Representative
π° Fees (Based on Scope)
- π Vary depending on floor area, occupancy type, and building classification
- π Additional discipline-specific fees apply (e.g., electrical, plumbing)
- π₯ Fire Code and Line & Grade fees are charged separately
π§Ύ Step-by-Step Application Process
- 1οΈβ£ Secure Locational Clearance and Barangay Permit
- 2οΈβ£ Prepare a complete set of plans, signed and sealed by licensed professionals
- 3οΈβ£ Submit documents to the OBO or online via bpms.cagayandeoro.gov.ph
- 4οΈβ£ Pay assessed permit fees at the City Treasurerβs Office
- 5οΈβ£ Receive your approved Building Permit from the OBO
- 6οΈβ£ Begin construction only after the permit has been issued
π Key Reminders for Demolition and Building Permit in Cagayan de Oro
- π« No Demolition, No Construction: Secure your Demolition Permit before applying for a Building Permit.
- π All plans must be prepared and signed by licensed professionals.
- π§ Do not start construction without official permits to avoid legal penalties.
- π Apply for a Certificate of Occupancy after construction is complete, before using or turning over the building.
π Need Help With Permit Processing?
At JMG Construction & General Merchandise, we streamline the permit process for homeowners, contractors, and developers in Cagayan de Oro. From document preparation to final approval, our team will guide you every step of the way.
π Call us at 09996196855 or email teamjmg@googlegroups.com to get started.
JMG Construction β We design. We build. We value people.








